Ariane 5 For January 27 Mission Delivered To Final Assembly Building | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Jan 13, 2016

Ariane 5 For January 27 Mission Delivered To Final Assembly Building

Launcher And Payload Preparations Continue For First Flight Of 2016

Ariane 5 launcher and payload preparations are in progress in French Guiana for Arianespace's first flight of 2016, which will orbit the initial EpicNG high-throughput satellite for global operator Intelsat.

The heavy-lift vehicle for this upcoming mission - designated Flight VA228 - is now located inside the Spaceport's Final Assembly Building following its transfer by rail from the Launcher Integration Building atop a mobile launch table.

With Ariane 5 now under Arianespace's responsibility, the launcher is in position to receive its Intelsat 29e payload - which will be followed by final verifications and subsequent rollout to the Spaceport's ELA-3 complex for a January 27 liftoff.

Intelsat 29e's own preparations are advancing in parallel activity at the Spaceport's S5 payload processing building. Having already completed its initial check-out process inside this state-of-the-art facility's S5C clean room, the Boeing-built satellite is now being transferred to the S5A fueling and integration hall.

The January 27 liftoff will kick off another busy year of mission activity for Arianespace, which is targeting a 2016 performance of up to 11 flights using its full launcher family - consisting of the heavy-lift Ariane 5, medium-lift Soyuz and lightweight Vega - in side-by-side operation at the Spaceport.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC