Wed, May 31, 2006
Six Customer Aircraft On Production Line
They can see
certification on the horizon. That's the word from Eclipse
Aviation, as the company announced Tuesday its Eclipse 500 test
fleet has exceeded 2,000 flight hours, and has completed the
majority of required FAA certification testing. The company also
announced that six customer Eclipse 500 VLJs are in various
assembly positions on the production line.
"Our test fleet of five Eclipse 500s continues to burn test
points and build hours at a rapid rate. We accumulated more than
300 flight hours in the last four weeks," said Vern Raburn,
president and CEO of Eclipse Aviation. "I am also thrilled to see
the production line coming to life. Last weekend, the first
customer Eclipse 500 forward fuselage was mated to the aft
fuselage."
Sources with Eclipse tell ANN the company has made significant
accomplishments in aircraft testing. Recent milestones include
successful completion of:
- All installed-engine operational certification tests, including
engine operating characteristics, restarts, cooling and
ventilation, engine exhaust influence on airframe temperature,
vibration, negative-g and powerplant drainage
- Unusable fuel and hot fuel certification tests
- Cabin air smoke clearing certification tests
- Flight test points and data collection in support of Part 36
noise certification
- Climate control system certification ground testing
- All fuel system certification ground tests
Eclipse's production line now has six aircraft in various
assembly positions. P1 (above, below) recently completed fuselage
mate and is in position seven awaiting wing mate. P2 (bottom) and
P3 have been moved off the production tools and are in cabin
build-up. The next three (P4, P5 and P6) production aircraft have
completed friction stir welding and are in sub-assembly
build-up.
As Aero-News reported in March, P1 will be delivered to customer
David Crowe -- who had the honor of triggering some
of the first friction-stir welding work on
his airframe -- shortly after FAA
certification.
Eclipse says the 500 is on track to achieve FAA
certification by the end of this quarter -- just one month from
today -- which should make the six-passenger jet the first VLJ to
market.
More News
Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]
“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]
"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]
IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]
Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]