Osprey Back In The Air | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Apr 08, 2004

Osprey Back In The Air

Tests Include Air-To-Air Refueling

The Navy's V-22 Integrated Test Team (ITT) recently flew the first air-to-air refueling flights since the program’s return to flight in May of 2002, an operation deemed successful.

Over the course of two one-hour sorties using Osprey No. 22, test pilots Marine Lt. Col. Kevin Gross and Steve Grohsmeyer each logged five "dry plugs" behind an Air Test and Evaluation Squadron (VX) 20 KC-130F operating near Naval Air Station Patuxent River (MD).

The primary reason for the flights was to re-establish Gross and Grohsmeyer’s day aerial refueling qualifications. Eventually, the ITT will have six pilots qualified to tank day and night, and at night while wearing night vision goggles--all part of the developmental test plan.

"Air-to-air refueling is an easy task in the V-22," Gross said after the flights. "The aircraft demonstrates positive and predictable characteristics in all axes, but especially in the thrust axis where the pilot’s ability to control closure rates is important."

Gross said this particular refueling exercise was done at airspeeds around 200 knots and an altitude of 10,000 feet.

Although Osprey No. 22 has an 11-foot fixed probe, the qualification flights were the initial step toward testing the new retractable refueling probe that will be installed on Osprey No. 21, currently being modified in Hangar 109 at Patuxent River. The developmental testing of the retractable probe will begin early next month and should last about three weeks. The retractable probe is just over 9 feet long when extended but is flush with the nose when stowed--a necessary feature for shipboard operations.

The V-22’s air-to-air refueling features are the cornerstone of the improvements in self-deployment capability and operational range over the legacy systems it will replace.

The air-to-air refueling developmental testing is just one area where the ITT is supporting Tilt-Rotor Operational Test Squadron (VMX) 22, the Osprey Test and Evaluation Squadron based at Marine Corps Air Station New River (NC) as they prepare for OPEVAL next year. Once developmental testing is complete--whether it is air-to-air refueling, formation flight, or shipboard operations--VMX-22 is cleared to begin operational testing in that area.

FMI: www.boeing.com/rotorcraft/military/v22

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC