US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 06, 2013

US Navy, Boeing Sign $2 Billion Order For 13 P-8A Poseidon Aircraft

Plans Call For 117 P-8A Aircraft, Which Are Based On Boeing 737-800

The U.S. Navy recently awarded Boeing a $1.98 billion contract for 13 additional P-8A Poseidon aircraft, continuing the modernization of U.S. maritime patrol capabilities that will ultimately involve more than 100 P-8As. The contract includes long-lead funding previously approved by the Navy. 

The Navy has now ordered 37 of the 117 P-8As it is expected to buy. To date, 10 have been delivered. Based on the Boeing Next-Generation 737-800 commercial airplane, the P-8 provides anti-submarine, anti-surface warfare as well as intelligence, surveillance and reconnaissance capabilities. The P-8 is replacing the Navy’s P-3 aircraft. 

“We’re on budget and on schedule and the Navy will stand up initial operational capability of this transformational aircraft by the end of the year,” said Rick Heerdt, Boeing vice president and P-8 program manager. 

“This new contract award will continue to deliver aircraft to the fleet squadrons scheduled to receive their initial batch of P-8As on cost, schedule and performance parameters in accordance with the approved Acquisition Program Baseline,” said Capt. Scott Dillon, the Maritime Patrol and Reconnaissance Aircraft Program Office’s program manager.

Boeing assembles P-8As in the same facility where it builds all its 737s. The Poseidon team uses a first-in-industry in-line process that takes advantage of the efficiencies in the Next-Generation 737 production system. After initial assembly, the   P-8A aircraft enter a separate mission system installation and checkout facility for final modifications and testing.

Initial operational test and evaluation (IOT&E) was completed in March; the Navy announced July 1 that the P-8A program had passed IOT&E and the P-8A was ready for fleet introduction.

(P-8 Poseidon image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC