Boeing Completes Destructive Testing On 787 Wing Box | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Nov 16, 2008

Boeing Completes Destructive Testing On 787 Wing Box

Must Withstand Forces Up To 1.5 Times Of Highest Expected Load

Boeing completed destructive testing Saturday on a full-scale composite wing box of the 787 Dreamliner, the first all-composite wing box ever built for a Boeing commercial airplane. This test is part of the certification process for the all-new jetliner.

"Successful completion of the wing box destruction test marks a major step forward in highlighting the innovation on the 787," said Mark Jenks, vice president of 787 Development. "In addition to determining the strength of the structure, the test helps us verify the analytical methods we have used to calculate the loads the structure will have to carry."

The wing box is a cantilevered beam that carries the wing to the fuselage and supports leading- and trailing-edge devices, control surfaces, engines and landing gear. The test piece represents a portion of the wing section that begins at about the center of the airplane and stops at approximately one-half of the span of the wing -- approximately 50 feet. The piece measures approximately 18 feet at its widest point.

The upper and lower surface panels and the spars of the wing are made entirely of the same composite material being used on the fuselage. The wing ribs are monolithic aluminum structures, each machined from a single piece of aluminum plate.

To meet certification requirements, the wings must withstand loads up to 1.5 times, or 150 percent, of the highest aerodynamic load that the jet could ever be expected to see in the entire lifetime of the 787 fleet.

The test wing box weighs 55,000 pounds, including a great deal of test-only hardware and instrumentation. It was designed and built by a joint team of Boeing, Mitsubishi Heavy Industries and Fuji Heavy Industries.

Structural testing will continue on two full-scale 787 airframes as part of the certification process for the airplane. Those tests will further demonstrate the performance of the structure through multiple lifetimes of normal operational loads and test the structure beyond the points expected to be seen in service.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC