ISS Crew Tries Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 01, 2004

ISS Crew Tries Again

Both Astronauts Going Out The Hatch

The two-man crew aboard the International Space Station was set Wednesday to try it again -- a spacewalk to repair a gyro-critical circuit breaker. Both American Michael Fincke and his Russian counterpart, Gennady Padalka were to participate in the walk, leaving the station itself unmanned for approximately six hours.

The spacewalk is aimed at restoring power to a gyroscope that helps control the Station's orientation in orbit.

The Expedition 9 crew's first spacewalk was cut short last Thursday when flight controllers in Moscow noticed almost immediately an unexpectedly high rate of pressure loss in the primary oxygen bottle on Astronaut Mike Fincke's Russian spacesuit.

Based on analysis, testing and troubleshooting by the crew, managers concluded the excessive oxygen pressure drop was caused by an open oxygen flow switch on Fincke's suit. The switch was not fully seated into the normal flow position before the spacewalk started, causing an unexpectedly swift flow of oxygen from the primary oxygen bottle into Fincke's spacesuit. Russian technicians concluded that it was an isolated event and gave the crew approval to use the same suits for tomorrow's rescheduled spacewalk. The spacewalk procedures have been updated to provide additional crew verification steps to ensure the handle is properly positioned.

The two spacewalkers will restore power to Control Moment Gyroscope (CMG) #2 by replacing a Remote Power Controller Module (RPCM). CMG #2 was taken off line April 21 by the failure of a circuit breaker in the RPCM. Currently, because of the failure of CMG #1 about two years ago, the attitude of the Station is being controlled by the two remaining CMGs.

FMI: http://www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC