Embraer Completes First Phenom 300 Wing Mate, Engine Install | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 18, 2008

Embraer Completes First Phenom 300 Wing Mate, Engine Install

First Flight Expected At Mid-Year

When it comes to introducing your first-ever light jet, it probably pays to have a lot of experience building larger commercial planes. Right on schedule, Embraer successfully performed the wing-fuselage mating, and installation of the engines, for its first Phenom 300 last week at its Gavião Peixoto plant.

In addition, the first electrical power-on test was successfully completed on Tuesday, March 4.

"We are excited to see the Phenom 300 program on schedule for a mid-year first flight," said Luís Carlos Affonso, Embraer Executive Vice President, Executive Jets. "The size and elegance of the aircraft, with its swept wing for high-speed cruise and long range, will make an impressive ramp presence. It is now becoming apparent how large the cabin is and how generous it is in terms of space and comfort."

Embraer has adopted what it terms a "multi-site strategy" for the Phenom programs, by expanding the Botucatu plant for preassembly and the Gavião Peixoto plant for final assembly, both located in outstate São Paulo, Brazil. (Hey, if you have to outsource, better to outsource to yourself... Ed.)

The Phenom 300 fuselage was assembled at Botucatu and arrived at the new Gavião Peixoto production hangar, where the engines were installed and systems integration began. The one-piece wing was also assembled in Botucatu, and measures 53 feet, 2 inches (16.2 meters) from tip to tip.

The Phenom family development team, formed by engineering, manufacturing planning, production, and quality assurance personnel, has made extensive use of CATIA V5 software and the Virtual Reality Center for digital design and manufacturing. Computer-aided production simulations ensured the precision and success of the first Phenom 300 assembly processes.

FMI: www.embraerexecutivejets.com

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC