STS-125: Three Out Of Five Spacewalks Successfully Completed So Far | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, May 17, 2009

STS-125: Three Out Of Five Spacewalks Successfully Completed So Far

"Batting 1000" To This Point

STS-125 mission specialists John Grunsfeld and Drew Feustel finished the mission’s third spacewalk Saturday at 4:11 p.m. EDT. The spacewalk lasted 6 hours, 36 minutes. During the endeavor outside the shuttle, Feustel and Grunsfeld removed the Corrective Optics Space Telescope Axial Replacement and installed in its place the new Cosmic Origins Spectrograph. They also completed the Advanced Camera for Surveys electronic card replacement work. The spacewalkers were ahead of schedule and were able to complete part 2 of the ACS repair, installing a new electronics box and cable.

Space shuttle Atlantis’ 11-day mission is the final shuttle flight to NASA’s Hubble Space Telescope. The seven-member crew will enhance the observatory and ensure cutting-edge science. The mission puts in place advanced technology that improves the telescope’s discovery power by 10 to 70 times. The five scheduled spacewalks will install new instruments and thermal blankets, repair two existing instruments, refurbish subsystems and replace gyroscopes, batteries and a unit that stores and transmits science data to Earth. The result will be six working, complementary science instruments with new capabilities, and an extended operational lifespan through at least 2014.

Saturday, the spacewalkers focused on the installation of the telescope’s new Cosmic Origins Spectrograph and completed the Advanced Camera for Surveys repair work. Engineers from the Space Telescope Operations Control Center at Goddard Spaceflight Center in Maryland powered up both components and reported good aliveness tests. More tests will be conducted during the astronauts sleep period.

On Sunday, starting at 9:16 a.m., astronauts Mike Good and Mike Massimino will repair the Space Telescope Imaging Spectrograph and install the New Outer Blanket Layer during the fourth STS-125 spacewalk.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC