Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Feb 05, 2013

Boeing Delivers 6th Production P-8A Poseidon Aircraft To US Navy

Final Delivery Of The First Production Lot

The sixth production P-8A Poseidon aircraft was delivered by Boeing to the U.S. Navy Jan. 31, successfully completing the first group of low-rate initial production aircraft that are dramatically improving the service's maritime patrol capabilities. The delivery is the final aircraft from a contract awarded in January 2011. Boeing is on schedule to build 24 P-8A maritime patrol aircraft as part of contracts awarded in 2011 and 2012.

"The P-8 team continues to incorporate efficiencies into our production as we ramp up deliveries in 2013," said Rick Heerdt, Boeing vice president and P-8 program manager. "We've reduced flow times and costs, which ultimately benefits our U.S. Navy customer."
 
The U.S. Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. It is a versatile multi-mission aircraft that provides broad long-range maritime patrol capabilities -- anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance. It is replacing the U.S. Navy's P-3 fleet.
 
"This aircraft delivery marks the beginning of a new era of maritime patrol aircraft," said Capt. Scott Dillon, Maritime Patrol and Reconnaissance Aircraft program manager. "The first fleet squadron is now equipped with P-8s, and will soon deploy with a maritime patrol capability that is greatly enhanced relative to our legacy P-3 force."
 
The next three Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, WA. Boeing will deliver its seventh production P-8A to the Navy later this quarter.
 
As part of the LRIP contracts, Boeing is also providing maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC