NGC Passes Key Design Review For B-2 Weapons Management Upgrade Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, May 31, 2015

NGC Passes Key Design Review For B-2 Weapons Management Upgrade Program

Air Force Approves Development Of New Software And Hardware

Northrop Grumman Corporation has successfully demonstrated to the U.S. Air Force that its plans to upgrade key weapons management software for the B-2 stealth bomber are on track and ready to proceed to the next level of development.

The company successfully completed the critical design review (CDR) of the service's Flexible Strike Phase 1 program on Feb 3.  Air Force approval of the CDR authorizes Northrop Grumman to begin development and integration of the new software and hardware required for the upgrade.

Northrop Grumman is the Air Force's prime contractor for the B-2, one of the most powerful and survivable long range strike systems in the world.

"The Flexible Strike software upgrade lays the foundation for future system enhancements, including the ability to carry multiple weapon types," said Col. Robert Strasser, U.S. Air Force, B-2 system program manager and chief of the B-2 division of the Air Force's Fighters and Bombers Directorate. "This 'mixed loads' capability will ensure maximum strategic nuclear and conventional strike capability."

CDR is a key review point in a three-year, $102 million contract awarded to Northrop Grumman in Aug. 2014.  The contract covers the engineering and manufacturing development (EMD) portion of the Flexible Strike Phase 1 program.

"The Flexible Strike software upgrade program will give the B-2 a simpler, more powerful way to manage communications with its weapon systems," said Dave Mazur, vice president and B-2 program manager, Northrop Grumman Aerospace Systems.  "It will also reduce B-2 maintenance costs, increase mission flexibility and increase aircraft reliability."

The B-2 currently uses software called an operational flight program (OFP) to manage the communication between the jet and the hardware that holds and dispenses its weapons. Under its EMD contract, Northrop Grumman is replacing several mission-specific OFPs with a single OFP that can manage all of the B-2's weapons carriage devices.

(Image from file)

FMI: www.northropgrumman.com/B-2

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC