FAA Breaks Ground For New Control Tower At Charlotte | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jun 08, 2016

FAA Breaks Ground For New Control Tower At Charlotte

Will Also House Radar Approach Control For The Airport

U.S. Transportation Secretary Anthony Foxx and FAA Deputy Administrator Michael G. Whitaker attended a groundbreaking ceremony late last week for a new 370-foot-tall air traffic control tower and radar approach control at Charlotte Douglas International Airport (CLT). The new tower will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the nation’s fifth busiest tower.

“This investment in our aviation infrastructure will position us to handle the future growth that we forecast for Charlotte,” said Secretary Foxx. “This new air traffic control facility will help us serve travelers at one of our busiest airline hubs for decades to come.”

“The FAA is committed to modernizing our air traffic control system,” said Deputy Administrator Whitaker, who also is the FAA’s Chief NextGen Officer. “Investing in NextGen will make air travel more efficient, dependable, and even safer.”

The new air traffic control tower will be equipped with state-of-the-art Next Generation Air Transportation System, or NextGen, technology including Standard Terminal Automation Replacement System (STARS), Data Communications, Automatic Dependent Surveillance-Broadcast (ADS-B), and Advanced Electronic Flight Strip System (AEFS). Charlotte also is the test site for Airspace Technology Demonstration (ATD-2).

The 850-square-foot tower cab has enough room to accommodate additional future air traffic control positions. The 42,000-square-foot base building will house an expanded terminal radar approach control (TRACON), with space for future growth. Training rooms, administrative offices, and a power distribution supply system will also be in the base building, along with the latest aviation security and air traffic simulation capabilities.

In addition, the new 370-foot-tall tower at CLT will provide air traffic controllers with a bird’s-eye view of the airfield, and will accommodate current operations and future growth. The new Charlotte tower will be the second tallest tower in the National Airspace System after the 398-foot-tall tower at Hartsfield-Jackson Atlanta International Airport. The existing tower was commissioned in 1979. The facility’s operational growth, new air traffic control technology, and the airport’s addition of new runways and taxiways made the height and size of the old tower obsolete.

Charlotte Tower controllers handled about 225,000 takeoffs and landings from January 1 to May 31, 2016, making it the fifth busiest tower in the country. In 2015, CLT was the sixth busiest tower, when controllers handled 544,000 takeoffs and landings. TRACON controllers handled 572,330 instrument operations (overflights) in 2015, making it the 13th busiest radar approach control. Traffic at CLT is forecast to grow to 748,000 by 2040.

CLT also handles significant quantities of air cargo and was recently included in the Department’s designation of the Interim National Multimodal Freight Network as one of the top airports for freight movement in the country.

A total of 179 FAA employees work at Charlotte Tower and TRACON – 136 in Air Traffic and 43 in Technical Operations. Technical Operations employees install and maintain air traffic control equipment.

The FAA awarded a $60 million contract to build the new facility in January 2016 to Archer Western Construction. Equipment, installation and training costs, and demolition of the old tower bring the total project cost to $112 million. Construction of the tower and TRACON base building is expected to be complete in 2018, and the facility will be fully operational in 2020.

(Source: FAA news release)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC