AD: McDonnell Douglas | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 11, 2007

AD: McDonnell Douglas

AD NUMBER: 2007-01-02
MANUFACTURER: McDonnell Douglas
SUBJECT: Airworthiness Directive 2007-01-02
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD), which applies to certain McDonnell Douglas Model MD-11 and -11F airplanes. That AD currently requires an initial general visual inspection of the power feeder cables of the integrated drive generator (IDG) and the fuel feed lines of engine pylons No. 1 and No. 3 on the wings for proper clearance and damage; corrective actions if necessary; and repetitive general visual inspections and a terminating action for the repetitive inspections. This new AD requires the existing actions, and for certain airplanes, this AD requires installation of new clamps on the power feeder cables of the IDG of engine pylons No. 1 and No. 3. This AD results from reports of IDG power feeder cables riding against structure and fuel lines in the No. 1 and No. 3 pylons. We are issuing this AD to prevent potential chafing of the power feeder cables of the IDG in engine pylons No. 1 and No. 3 on the wings, and consequent arcing on the fuel lines in the engine pylons and possible fuel fire.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC