NASA Exercises Expendable Launch Vehicle Contract Option | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Aug 21, 2013

NASA Exercises Expendable Launch Vehicle Contract Option

A.I. Solutions Wins $56 Million Award

NASA has exercised the first option on a contract providing integrated services for the preparation and launch of the next generation of the agency's scientific and exploration spacecraft.

The two-year Option Period 1 on the Expendable Launch Vehicle Integrated Support (ELVIS) 2 contract, operated by a.i. solutions Inc. of Lanham, Md., begins Oct. 1 and is valued at about $56.5 million. The contract contains another potential option period that would begin in October 2015, if exercised.
 
The ELVIS 2 contract began in April 2012 and has a potential maximum value of $138.1 million. This contract resulted from a competitive small business set-aside.
 
The ELVIS 2 contract supports NASA's Launch Services Program (LSP) and LSP-sponsored missions, activities and strategic initiatives for multiple NASA programs, the Defense Department and other government agencies and commercial launch activities. The contractor will support program management; vehicle engineering and analysis; launch site engineering; communications and telemetry; technical integration services; LSP programmatic safety, reliability and quality assurance; LSP operations at Vandenberg Air Force Base in California; information technology; and special studies.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC