GA-ASI Maximizing Fuel Capacity For MQ-25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jul 14, 2018

GA-ASI Maximizing Fuel Capacity For MQ-25

Integrated Fuel Tank Structure Improves Fuel Carriage And Delivery Capacity

General Atomics Aeronautical Systems, Inc. (GA-ASI) is using an integrated fuel tank structure to maximize fuel offload for the proposed MQ-25 unmanned aerial refueling aircraft for the U.S. Navy. GA-ASI applied its knowledge of advanced composite aircraft structures to develop integrated fuel tanks in a large-scale wing box test article and a full-scale wing skin pre-production validation article.

The wing box tested to failure via wing bending at GA-ASI’s Adelanto, Calif. structural test facility in November 2017. In April, the company verified the production readiness of the co-cured wing and tail components using both non-destructive and destructive inspections.

“The integral fuel tank wing box test article will reduce technical and schedule risk for the program,” said David R. Alexander, president, Aircraft Systems, GA-ASI. “Specifically, through extensive validation of fuel containment sealing methods, advanced non-linear buckling finite element analysis models and thick composite laminate construction, we have accelerated engineering design consideration prior to the detail design phase and production.”

A full-scale inner-wing skin demonstration article built in March at GA-ASI’s Spanish Fork, Utah facility verified the MQ-25 tooling concepts, lamination approach, and processes. The team validated the outer mold line tooling approach for the build process which enables accelerated engineering and tooling fabrication for the MQ-25 program.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC