Boeing Admits to Needed Changes In 787 Power Panel, Software Updates | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Nov 27, 2010

Boeing Admits to Needed Changes In 787 Power Panel, Software Updates

Yet Another Delay For Boeing's Most Ambitious New Airframe

Just after the close of business on Wednesday (ET) , as most of the media was heading off to start various Turkey-oriented pursuits, Boeing admitted that it is developing minor design changes to power distribution panels on the 787 and updates to the systems software that manages and protects power distribution on the airplane. These changes come as the result of what has been learned from the investigation of an onboard electrical fire on a test airplane, ZA002, earlier this month in Laredo, Texas.

"We have successfully simulated key aspects of the onboard event in our laboratory and are moving forward with developing design fixes," said Scott Fancher, vice president and general manager of the 787 program. "Boeing is developing a plan to enable a return to 787 flight test activities and will present it to the U.S. Federal Aviation Administration (FAA) as soon as it is complete."

Boeing states that, 'Engineers have determined that the fault began as either a short circuit or an electrical arc in the P100 power distribution panel, most likely caused by the presence of foreign debris. The design changes will improve the protection within the panel. Software changes also will be implemented to further improve fault protection.'

The P100 panel is one of five major power distribution panels on the 787. It receives power from the left engine and distributes it to an array of systems.

The 787 team is now assessing the time required to complete the design changes and software updates that are being developed. A revised 787 program schedule is expected to be finalized in the next few weeks -- but pundits are expecting more schedule delays and some chest-pounding by customers who have been waiting for their Dreamliners for quite some time.

"Our team is focused on developing these changes and moving forward with the flight test program," said Fancher. "The team in Laredo is also well along in preparing to return ZA002 to Seattle."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC