AD: Pacific Aerospace Limited Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 25, 2020

AD: Pacific Aerospace Limited Airplanes

AD 2020-17-08 Describes The Unsafe Condition As Insufficient Electrical Bonding Of The Wing Lightning Protection Panels

The FAA is adopting a new airworthiness directive (AD) for Pacific Aerospace Limited Model 750XL airplanes with wing lightning protection panels installed.

This AD results from mandatory continuing airworthiness information (MCAI) issued by the aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as insufficient electrical bonding of the wing lightning protection panels. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective September 14, 2020.

Supplementary Information: The Civil Aviation Authority of New Zealand (CAA) has issued AD DCA/750XL/21, dated December 15, 2017 (referred to after this as “the MCAI”), to correct an unsafe condition for Pacific Aerospace Limited Model 750XL airplanes with wing lightning protection panels installed. To accompany the MCAI, the CAA issued Notification of Airworthiness Directive issued for New Zealand Aeronautical Products IAW ICAO Annex 8, dated December 15, 2017, which states: This [CAA] AD with effective date 22 December 2017 mandates an electrical bonding inspection of the wing lightning protection panels per the requirements in Pacific Aerospace Mandatory Service Bulletin (MSB) PACSB/XL/092 issue 2, dated 15 December 2017, or later approved revision.

The [CAA] AD is prompted by the possibility that there may be insufficient electrical bonding between the lightning protection panels and the airframe.

Due to a report of an airplane with wing lightning strike panels that were not bonded to the airframe and without information confirming whether the bonding was performed properly during the assembly process, a check of all airplanes in operation is necessary.

In addition to the inspection of the electrical bonding on the wing lightning protection panels, the MCAI also requires repair of any insufficient electrical bonding found during the inspection.

FMI: www.regulations.gov Docket No. FAA-2020-0769

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC