Lycoming Receives FAA Certification for Crankshaft Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 08, 2003

Lycoming Receives FAA Certification for Crankshaft Production

Increased Quality and Testing Systems Implemented

Lycoming has received final certification from the FAA for the production of new crankshafts. Already in limited production on a risk-release basis (allowing production to begin prior to certification), these crankshafts will be used to replace crankshafts in Lycoming engines affected by Service Bulletins 550, 552 and 553.

Each crank will be inspected by SEM.

Working closely with the FAA, Lycoming and its supplier have improved the production, quality and testing processes for the crankshafts. Additional improvements to these processes include:

  • Press forging of all crankshafts with automated induction heating
  • Temperature monitoring at furnace exit when forging crankshafts
  • Enhanced work instructions for supplier shop floor personnel
  • Comprehensive training of supplier personnel
  • Impact (Charpy) testing on all replacement crankshafts
  • Scanning Electron Microscope analysis of each crankshaft
  • Increased frequency of quality audits at the supplier by Lycoming personnel

"We are confident that the new production process is sound and that stringent systems are in place to protect against a repeat of the problem. However, as safety is our top priority, we continue to conduct testing of each and every crankshaft to be certain the process is working correctly," said Lycoming President Mike Wolf. To date, more than 600 replacement crankshaft forgings have been successfully produced and tested.

"Beginning today, about 15 Lycoming Authorized Repair Facilities around the world, including Lycoming's factory and service center, will install replacement crankshafts in 20-30 engines a day as production crankshafts become available," the company said Tuesday. Lycoming's factory will have an assembly line and staging area dedicated to both engine inspection and parts flow coordination. Once off the line, each engine will be thoroughly tested. Lycoming's goal is to install replacement crankshafts in all the affected engines by early in the second quarter of 2003.

Unprecedented customer care, in the meantime...

Until the affected engines are returned to service, Lycoming has offered one of the most extensive Customer Care programs in general aviation history to help alleviate customer inconvenience. In addition to repairing and replacing internal parts, the program includes alternate transportation or fixed costs (includes interest on loans, ground insurance and hangar rental), and remote hangar fees, plus an additional 12 month engine warranty from the date the engine is returned to service. Lycoming has earmarked over $35 million to fund these efforts.

FMI: www.lycoming.textron.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC