AD: CTRM Aviation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 16, 2007

AD: CTRM Aviation

AD NUMBER: 2007-04-02
MANUFACTURER: CTRM Aviation Sdn. Bhd.
SUBJECT: Airworthiness Directive 2007-04-02
SUMMARY:
The FAA is adopting a new airworthiness directive (AD) to supersede AD 2004-11-04, which applies to all CTRM Aviation Sdn. Bhd. (Formerly Eagle Aircraft (Malaysia) Sdn. Bhd.) Model Eagle 150B airplanes. AD 2004-1-04 currently requires you to inspect certain canard inboard flap hinge support brackets (initially before further flight and repetitively before the first flight of each day) and perform any necessary follow-up action. This AD results from mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Malaysia to require the installation of improved design inboard flap hinge brackets as terminating action for the repetitive inspections. Consequently, this AD retains the requirement that you inspect certain canard inboard flap hinge support brackets (initially before further flight and repetitively before the first flight of each day) and then requires that you replace the parts with new design inboard flap hinge brackets as terminating action for the repetitive inspections or if cracks are found. We are issuing this AD to detect and correct cracks in the canard inboard flap hinge support brackets, which could result in loss of retention of controls and consequently, loss of airplane control.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC