Boeing Says Fasteners All Right For First 787 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jan 29, 2009

Boeing Says Fasteners All Right For First 787 Flight

Faulty Attachments Located In Hard-To-Reach Areas

Boeing has announced it will make the first flight of its new 787 Dreamliner without replacing faulty fasteners in some hard-to-reach areas of the plane, to avoid further delays in development of the popular new plane.

Program spokeswoman Yvonne Leach told The Associated Press, "There has been a huge effort to go in and replace a huge number of these fasteners." She says the ones to be left in place do not pose safety risks, but will ultimately be replaced before the affected aircraft reach customers.

Fasteners have been a huge burr under Boeing's saddle of late. Dreamliner development has been held up, first by a shortage of fasteners for assembly of composite portions of the plane, then by a contractor who installed them improperly.

Then, in November, Spirit Aerosystems, another contractor, discovered that for more than a year, nutplates used in inaccessible areas of Boeing's 737s had missed getting required anti-corrosive cadmium coatings. Days later, the problem was also found to affect widebody models as well, 476 planes in all.

Boeing reports 910 Dreamliners on order from airlines and leasing companies. Leach says the latest fastener headache will not change plans to make the 787's first flight by mid-year.

A total of six development aircraft will be flown through testing with the substandard fasteners.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC