Stennis Certified For Flight Operations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 17, 2014

Stennis Certified For Flight Operations

Flight Deck Certification Completed Following 16 Months In Port

Nimitz-class aircraft carrier USS John C. Stennis (CVN 74) and Carrier Air Wing (CVW) 9 successfully completed flight deck certification Dec. 12, after a 16-month Docking Planned Incremental Availability period.

Representatives from each CVW9 squadron embarked Stennis Dec. 5 to perform aircraft launch and recovery operations over the course of three days.

Flight deck certification started about 120 days before this underway, said Lt. j.g. Mark Rodriguez, Stennis' flight deck officer. "We have to be certified to launch and recover aircraft by the commander of Naval Air Forces handling team prior to conducting flight operations," said Rogdiguez.
 
The certification was the first time Stennis and CVW9 have operated together since deploying in 2013. "It's been a good experience getting familiar with shipboard life again," said Aviation Boatswain's Mate (Equipment) 1st Class Wendell Ramos of Helicopter Sea Combat Squadron (HSC) 14. "It's important to build that relationship between the air wing and ship."
 
For many of Stennis' and CVW9's personnel, this underway was their first time to see flight operations. "It's scary but exciting at the same time," said Logistics Specialist Seaman Edward Mitchell, from Fayetteville, North Carolina. "There [are] propellers spinning, planes taking off and landing, things that you normally only see in movies."
 
Stennis and CVW9 performed 160 launch and recoveries during day and night operations throughout the certification process. "The purpose of flight deck certification is to make sure all the pieces fall in together," said Lt. j.g. Mark Trask, an aviator assigned to Helicopter Sea Combat Squadron (HSC) 14. "The equipment, personnel, catapults and carrier air traffic control have to be certified and ready to launch and recover aircraft in support of future air missions."

Completing flight deck qualifications brings Stennis one step closer to becoming fully combat ready.
 
ANN Salutes Mass Communication Specialist 3rd Class Jonathan Jiang, USS John C. Stennis Public Affairs

(U.S. Navy image)

FMI: www.stennis.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC