Rex Moves B737 FFS From Ansett Grounds, Refusing Sale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Mar 27, 2024

Rex Moves B737 FFS From Ansett Grounds, Refusing Sale

Domestic Carrier Digs In Its Heels, Establishing Own Trading Facility After Leaseback Loggerheads

Rex, the “largest independent regional and domestic airline” in Australia, stood its ground in a beef with international but somehow surprisingly Australian Ansett Aviation Training, deciding to move their expensive, spiffy 737 sim to a new facility instead of selling it off.

The tale is interesting - or as close to interesting as drama in the aviation training industry goes - as the Rex Level D FFS, a Boeing 737NG, UPRT-approved model, had spent its life at an Ansett facility in Brisbane, Australia. Its term of residence expired in 2023, and Ansett Aviation Training refused to extend its term with a new contract. Rex says that they were only given the option of selling the simulator to Ansett, or de-installing it and making the costly trek to facilities elsewhere at a not-inconsiderable cost. From the sound of it, they fully expected Rex to sell offf the asset and be on their way, but Rex says they “chose not to give in to coercion, and began construction of its own purpose-built simulator centre next to Rex Head Office at Mascot, Sydney”.

It's always nice to see someone dig their heels in during negotiations, particularly when they opt to take the principled, expensive, and difficult approach. Rex General Manager of Flight Ops and Chief Pilot, Paul Fisher, commemorated the opening of the sim in its new home, saying “It is pleasing to see the FFS being commissioned on schedule in its new location and flying better than before due to new hydraulic and electrical components installed.”

“This is an important milestone in supporting the growth of our 737 fleet and clearly demonstrates the commitment of the Rex Board and Management to safety by investing in this critical piece of training infrastructure. As well as adding synergies to our own training requirements the simulator also provides training opportunities for external operators both inside and outside of Australia."

FMI: www.rex.com.au

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC