ARINC Opens New MRO Facility At Will Rogers World Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Apr 03, 2007

ARINC Opens New MRO Facility At Will Rogers World Airport

OKC Operation Sports Largest Hangar In Area

On Tuesday, ARINC Engineering Services, LLC opened a sophisticated new 81,000 square-foot Aircraft Modification and Operations Center at Oklahoma City’s Will Rogers World Airport, featuring the largest commercial aircraft hangar in the OKC area.

Oklahoma Lieutenant Governor Jari Askins welcomed guests,and a ribbon-cutting was performed by John M. Belcher, ARINC Chairman and Chief Executive Officer, Michael Young, ARINC Vice President, Aerospace Engineering Systems & Support, Richard Tanenbaum, CEO of Gardner Tanenbaum Group, and Mark Kranenburg, Oklahoma Director of Airports.

Offering more than an acre of hangar space under roof, the ARINC Aircraft Modification and Operations Center (AMOC) is large enough to accommodate four C-130 aircraft inside the hangar and eight more on the ramp. Located near the airport runways, the facility is easily accessible to commercial or military aircraft.

"ARINC serves two fast-expanding markets, for modernization of military aircraft and upgrading of commercial and general aviation airframes," stated ARINC Vice President Mike Young. "This Center is four times the size of our last facility and allows room for aggressive growth here. We have three aircraft programs operating already -- for C-26 surveillance aircraft from the Department of State, and for Cessna Encore and Citation X airframes. The size of this new facility makes our Citation X program feasible."

ARINC transferred an established work force, procedures, and certifications from its former Sundance Airpark operations to the new, larger OKC facility which is configured to handle multiple aircraft programs simultaneously. Some 30,000 square feet of offices and backshops provide in-house capability to fabricate, test, and inspect modification kit equipment—reducing the risk of delays during installation. The offices include space for visiting customers as well as ARINC management and operations personnel.

On-site capabilities include Heavy Aircraft Modifications & Upgrades, Avionics Installations, Line & Heavy aircraft maintenance, Aircraft Systems Integration & Engineering Design. The Center’s location at an international airport means virtually any needed service is available, and ARINC has pre-arranged for expedited services such as fueling and defueling of aircraft.

ARINC’s new Center is an FAA Certified Part 145 Repair Station and has certified Government Flight Risk (GFR) systems in place for both ground and flight operations. It is the one of the few approved Rockwell Collins Installation & Modification Agency for Business and Regional systems in the U.S. ARINC currently offers Academic and On-aircraft training at the facility, including Pilot proficiency and mission training, Avionics and Missions systems training, and Aircraft Maintenance training.

FMI: www.arinc.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC