Soyuz Is In The Launch Zone For Its December 17 Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Dec 16, 2015

Soyuz Is In The Launch Zone For Its December 17 Mission

Will Launch Galileo Navigation Satellites From French Guiana

Arianespace’s medium-lift Soyuz has moved to the launch pad in French Guiana – and is now ready for integration of its two Galileo satellite passengers at the workhorse vehicle’s dedicated Spaceport complex.

With the rollout and vertical positioning of the basic three-stage vehicle, Arianespace’s Soyuz marked a key step toward its December 17 mission that will deploy the latest two FOC (Full Operational Capability) satellites for Europe’s Galileo space-based navigation system.

The Soyuz for Arianespace’s Flight VS13 is shown after being suspended over the launch pad by four support arms. At left is the 53-meter-tall mobile gantry, which is moving in to protect Soyuz during the upcoming integration of its “upper composite.”

Soyuz was moved via a transport/erector rail car in a horizontal-transfer process from the MIK launcher assembly facility to the Soyuz ELS launch complex – located at the Spaceport’s northwestern sector within the commune of Sinnamary. Once on the launch pad, Soyuz was erected to the vertical orientation, where it was suspended in place by four large support arms, followed by the transport/erector rail car’s withdrawal.

With this step complete, the mobile gantry was moved into position around the launcher, providing protection for the subsequent installation of Soyuz’ “upper composite” – composed of the two Galileo spacecraft and their dispenser system, the Fregat upper stage and payload fairing.

The December 17 launch – designed VS13 in Arianespace’s numbering system – is scheduled to lift off at precisely 8:51:56 a.m. local time in French Guiana, with its Galileo satellite passengers to be deployed during a flight lasting approximately 3 hrs., 47 min.

Flight VS13’s passengers were built by OHB System, and their navigation payloads were supplied by Surrey Satellite Technology Ltd.

The European Commission is managing and funding Galileo’s FOC phase – during which the network’s complete operational and ground infrastructure is being deployed. The European Space Agency has been delegated as the design and procurement agent on the Commission’s behalf.

(Image provided with Arianespace news release)

FMI: www.arianspace.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC