NASA Changes Course On Hubble | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, May 02, 2005

NASA Changes Course On Hubble

Beginning Work At Goddard

NASA Administrator Michael Griffin announced Friday that preparation work would begin for a space shuttle flight to save the Hubble Space Telescope. A decision to actually fly the mission will not be made until after the shuttle returns to flight and additional tests are conducted.

"What we're going to be doing is getting the Shuttle Mission 4 servicing folks at Goddard started on the work that they would have to do if a servicing flight can yet be done," said Griffin.

This reverses the decision by Sean O'Keefe that a space shuttle mission would be unsafe. Griffin acknowledged, "there are substantive technical questions remaining on the shuttle end of things that we simply can't answer until we return to flight. So there is the issue of possibly we would be expending some money that would ultimately not serve our purpose."

Congress had allocated funds towards a Hubble servicing mission and Griffin is attempting to comply with that legislation. Numerous reviews of robotic missions have all concluded that limited time and money would prevent the success of a robotic solution. "So that's off the table," said Griffin.

When asked if this could interfere with the shuttle's return to flight, Griffin said, "We're not going to allow any of the SM-4 work on Hubble to interfere with return to flight. I mean, that is a guarantee. But the folks out at Goddard who are needed to prosecute that effort are not in the series path on return to flight."

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC