The Countdown Starts (Again) Saturday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 21, 2005

The Countdown Starts (Again) Saturday

NASA Aims for Tuesday Morning Launch

NASA officials have announced plans to the begin the countdown to a July 26 launch of Space Shuttle Discovery. The countdown will start Saturday, with a test of the External Tank to follow early on launch day. If all goes well with the test, the countdown will continue to liftoff at 1039 EDT on Tuesday.

In the meantime, technicians will work with grounding wiring associated with the liquid hydrogen engine cutoff sensor system, as well as adjust the configuration of components within Discovery's point sensor box. During a briefing held after a mission managers meeting, NASA Space Shuttle Program Manager Bill Parsons said "We've all agreed that this work is doable, and that it all takes us to a launch on the 26th."

The engine cutoff sensors are mounted at the bottom of the External Tank and trigger the orbiter's engines to shutdown in the event liquid hydrogen levels run low. The system failed a routine pre-launch check during the countdown on July 13, causing NASA to postpone Discovery's first launch attempt.

The window to launch Discovery to the International Space Station extends through July 31.

FMI: www.nasa.gov/returntoflight/main

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC