West Palm Beach Mayor, Others Fight Expansion Of PBI Runway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Feb 28, 2007

West Palm Beach Mayor, Others Fight Expansion Of PBI Runway

GA Runway May Be Expanded For Commercial Traffic

Opponents of a proposed extension to a runway at Florida's Palm Beach International Airport recently gained a powerful ally -- West Palm Beach mayor Lois Frankel.

The Palm Beach Post reports six area residents, who live under the flight path for runway 9L/27R have banded together to thwart the FAA's three-year, $1 million environmental study on lengthening the runway from its current 3,200-foot length, to 8,000 feet. The plan would allow two parallel runways to operate for commercial traffic -- one for landings, another for takeoffs.

Airport officials say the move is necessary to prevent delays, as the airport gains airline traffic over the next 10 years... but many neighbors, led by Frankel, say the FAA needs to consider the impact on noise and livability of their homes.

"We are asking our federal authorities to continue to make process to lessen the noise and lessen the pollution that these people deal with every single day," Frankel said. "We are asking the public to come out and support us."

To be fair, many of the residents living near the airport aren't the usual NIMBY crowd; some homes date back over 80 years, and residents have for the most part grown accustomed to the steady stream of light aircraft traffic flying overhead.

Jet airliners, on the other hand, are an entirely different animal.

"This is not just about noise pollution," said Vedado Neighborhood Association president Jose Rodriguez. "It is also about the fact that the lifestyles are going to be changed forever." Rodriguez's neighborhood lies just east of a neighborhood where some 350 homes were purchased, then bulldozed, over proximity concerns.

"This is PBIA on steroids," added Al Vazquez, president of the Parker Ridge neighborhood, to the Post. "They are building capacity into this airport that nobody wants and nobody needs."

Airport officials disagree with that statement.

"The key here is to handle the volume," airport spokeswoman Lisa De La Rionda said. "There is one piece of pavement to deal with this. Not only are they dealing with this cluster of departures, but they are also dealing with arrivals."

On Sunday, she notes, 718 flights were recorded on the airport's monitoring system... and that number is only going to increase. By 2018, delays at PBI could be as long as 20 minutes; with the runway extension, officials say the number would drop to five minutes.

Mayor Frankel's office has contacted area Congressman Ron Klein, as well as US Senator Bill Nelson, imploring both legislators to speak out against the extension. Rodriguez has also started a petition drive, seeking to cut off funding for the extension.

"In the end, it's federal," Frankel (above, right) said. "If there is not money to expand, they are not going to be able to expand."

FMI: www.cityofwpb.com/mayor/mayor.htm

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC