Loyal Wingman UAV Conducts First High-Speed Taxi Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Dec 24, 2020

Loyal Wingman UAV Conducts First High-Speed Taxi Test

Will Resume Final Taxi Tests And Preparations For Flight In Early 2021

The Royal Australian Air Force (RAAF) has completed the first high-speed taxi test of the Loyal Wingman in preparation for first flight.

Boeing test personnel monitored the aircraft’s performance and instrumentation from a ground control station to verify the functionality while the vehicle reached accelerated speeds. The uncrewed aircraft has been undergoing low-, medium-, and high-speed taxi testing at a remote test location in Australia.

“Our test program is progressing well, and we are happy with the ground test data we have collected to date,” said Paul Ryder, Boeing Flight Test manager. “We are working with the Air Warfare Centre to complete final test verifications to prepare for flight testing in the new year.”

Boeing and the Royal Australian Air Force will resume final taxi tests and preparations for flight in early 2021 when the range reopens.

RAAF Head of Air Force Capability Air Vice-Marshal Cath Roberts said seeing the aircraft in person during the December trials had been extraordinary.

“There is something very special about testing an aircraft that takes technology to the next level. It is iconic in its own way,” said Roberts. “Experiencing the enthusiasm of the Boeing and Air Force team reminded me of my early career testing aircraft.”

“This is what innovation is all about – working together to achieve many firsts,” she said.

More than 35 Australian suppliers on the Australian industry team have contributed to the aircraft development, including investment partner BAE Systems Australia, which has been embedded with the Boeing test team on-site.

“In the past year alone, we have made amazing strides on this aircraft, taking it from a fuselage to a finished aircraft that has undergone rigorous testing,” said Dr. Shane Arnott, program director of the Boeing Airpower Teaming System.

“Our focus now is on conducting a safe and secure flight-test regimen for the Loyal Wingman program.”

FMI: www.boeing.com/defense/airpower-teaming-system

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC