AD: Airbus Helicopters Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Apr 23, 2019

AD: Airbus Helicopters Deutschland GmbH Helicopters

AD NUMBER: 2019-07-07

PRODUCT: Various Airbus Helicopters Deutschland GmbH (Airbus Helicopters) Model MBB-BK117 and Model BO-105 helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires removing the swashplate bellows (bellows) and repetitively inspecting the swashplate assembly.

This AD was prompted by reports of loose and missing clamps installed on bellows.

DATES: This AD is effective May 24, 2019.

COST: The FAA estimates that this AD affects 286 helicopters of U.S. Registry. Operators may incur the following costs in order to comply with this AD:
Labor costs are estimated at an average $85 per work hour.

  • Removing and inspecting the swashplate assembly requires 3 work-hours. No parts are needed for a cost of $255 per helicopter and $72,930 for the U.S. fleet per inspection cycle.
  • Repairing a scratched support tube requires 3 work-hours. No parts are needed for a cost of $255 per helicopter.
  • Replacing a corroded or damaged clamp requires 2 work-hours. Parts cost $8 for a cost of $178 per helicopter.
  • Replacing corroded ball bearings requires 4 work-hours. Parts cost $3,000 for a cost of $3,340 per helicopter.
  • Removing foreign objects from the outer deflection ring requires 2 work-hours. No parts are needed for a cost of $170 per helicopter.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC