V-22s Grounded: Hydraulic Problems Blamed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 06, 2003

V-22s Grounded: Hydraulic Problems Blamed

The V-22 Osprey Joint Program Office and Naval Air Systems Command have directed a temporary suspension of flight operations pending the replacement of specific hydraulic lines in the engine nacelles of the five aircraft currently assigned to the flight test program.

After completing extensive quality inspections and tests, program technicians determined that several production lots of ¼-inch hydraulic lines provided by an Osprey Team supplier do not meet performance specifications. Although a single failure of any of the hydraulic lines in question would not immediately jeopardize an aircraft during flight, program officials decided to replace suspect high- and low-pressure line components that control the aircraft's swashplate actuators. That means 20 lines per aircraft will be replaced.

Replacement of these components in all flight test aircraft should be complete in about two weeks, and normal flight operations should resume around March 18-20.

Program officials will make further determinations about the need to replace suspect lines that may be used in other areas of the test aircraft as well as in aircraft currently in modification or production. Bell and Boeing technicians are currently determining the extent of these quality issues. The V-22 Joint Program Office has already initiated efforts to qualify new suppliers and the process is well under way to qualify other manufacturing sources for similar components to ensure that all hydraulic systems in the V-22 meet or exceed the program's stringent quality requirements.

FMI: www.bellhelicopter.textron.com, www.boeing.com, www.navair.mil, http://pma275.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC