NASA Awards Launch Contract For Transiting Exoplanet Survey Satellite | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Dec 22, 2014

NASA Awards Launch Contract For Transiting Exoplanet Survey Satellite

SpaceX Selected To Launch TESS Mission In 2017

NASA has selected SpaceX to provide launch services for the Transiting Exoplanet Survey Satellite (TESS) mission. TESS will launch aboard a Falcon 9 v1.1 launch vehicle, with liftoff targeted for August 2017 from Cape Canaveral Air Force Station in Florida.

The total cost for NASA to launch TESS is approximately $87 million, which includes the launch service, spacecraft processing, payload integration, tracking, data and telemetry, and other launch support requirements.

TESS’s science goal is to detect transiting exoplanets orbiting nearby bright stars. During a three-year funded science mission, TESS will sample hundreds of thousands of stars in order to detect a large sample of exoplanets, with an emphasis on discovering Earth- and super-Earth-sized planets in the solar neighborhood.

The Launch Services Program at NASA's Kennedy Space Center in Florida is responsible for management and oversight of the Falcon 9 v1.1 launch services for TESS. The TESS Mission is led by the Massachusetts Institute of Technology, with oversight by the Explorers Program at NASA's Goddard Space Flight Center in Greenbelt, Maryland.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC