AD: Airbus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Apr 24, 2011

AD: Airbus

AD NUMBER: 2011-08-05

MANUFACTURER: Airbus Model A310 Series Airplanes; and Model A300 B4-600, A300 B4-600R, A300 F4-600R Series Airplanes, and Model A300 C4-605R Variant F Airplanes (Collectively Called A300-600 Series Airplanes)
SUBJECT: Airworthiness Directive 2011-08-05

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

The ball screw nut assemblies of the first 70 Trimmable Horizontal Stabilizer Actuators (THSA) manufactured by Goodrich were fitted with an upper attachment gimbal having a thickness of 58 mm (2.28 in), which is different from the design of the final production standard. The gimbal installed on the subsequent THSAs (final production standard) is more robust, having a thickness of 70mm (2.76 in).

During the fatigue life demonstration of the THSA upper attachment primary load path elements, only a gimbal having a thickness of 70mm (2.76 in) was used. Thereafter, no additional justification work to demonstrate the robustness of the upper attachment fitted with a gimbal of 58 mm was accomplished. In case of failure of this gimbal, the THSA upper attachment primary load path would be lost and the THSA upper attachment secondary load path would engage.

Because the upper attachment secondary load path will only withstand the loads for a limited period of time, the condition where it would be engaged and not detected could lead to failure of the secondary load path, which would likely result in loss of control of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/4A83EE30CAAE6375862578790051C638?OpenDocument

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC