FAA May Drop RVSM Application Requirement For Planes With ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Aug 09, 2017

FAA May Drop RVSM Application Requirement For Planes With ADS-B

Current Approval Process For Reduced Vertical Separation Minimum Authorization Would Remain In Place For Those Aircraft That Need It

The FAA is proposing to change the Reduced Vertical Separation Minimum (RVSM) authorization process by eliminating the need for U.S.-registered operators to apply for RVSM authorization when their aircraft meet altitude-keeping requirements and are equipped with qualified Automatic Dependent Surveillance-Broadcast (ADS-B) Out systems.

The FAA has been a major force in the implementation of RVSM since it was first introduced in 1997. RVSM reduced the vertical separation between aircraft above 29,000 feet from a minimum of 2,000 feet to 1,000 feet. This saves fuel and increases airspace capacity. RVSM airspace has now been implemented worldwide.

Currently, operators must prove their aircraft design satisfies RVSM performance requirements and that they have policies and procedures for the safe conduct of RVSM operations, before the FAA approves their RVSM authorization. Until recently, they also had to have a separate program to maintain RVSM systems and equipment. The FAA granted authorizations to operate in RVSM airspace only after finding that the pertinent requirements were met.

The proposed changes for RVSM authorizations would allow the FAA to leverage the technology in ADS-B Out systems to monitor altitude-keeping performance on RVSM-capable aircraft whenever they fly in U.S. ADS-B airspace. Properly equipped aircraft could conduct RVSM operations immediately, lowering costs and eliminating the delays associated with application processing. ADS-B becomes mandatory for aircraft operating in most U.S. airspace on January 1, 2020.

The current RVSM approval process would still be available for operators whose airplanes do not routinely operate in airspace where the FAA has sufficient ADS-B data to determine RVSM performance, or when a foreign country requires a specific approval.

(Source: FAA)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC