FAA Revises CFM International Engine AD | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, May 18, 2018

FAA Revises CFM International Engine AD

Accelerates Timeline For Initial Inspections

The FAA is mandating an accelerated timeline for the inspection of CFM56 engines of the type that suffered an uncontained engine failure on a Southwest Airlines 737. That incident led to the rapid decompression of the airplane, and the fatal injury of one of the passengers who was partially pulled out of a window of the aircraft.

According to the AD 2018-10-11, the FAA is revising the compliance time for the initial inspections of certain higher-risk fan blades mandated by AD 2018-09-10. This AD was prompted by a recent engine failure due to a fractured fan blade that resulted in the engine inlet cowl disintegrating and debris penetrating the fuselage, causing a loss of pressurization, and prompting an emergency descent.

Since AD 2018-09-10 was issued, an investigation of this event has determined new methods for identifying applicable parts as well as the need to reduce the compliance time for certain fan blades. Therefore, this AD requires inspection of higher risk fan blades, identified using one of the methods in CFM Service Bulletin (SB) CFM56-7B S/B 72-1033, Revision 01, dated May 9, 2018, within 30 days from the effective date of the AD.

The remaining fan blades must be inspected within 90 days from the effective date of the AD or prior to accumulating 20,000 flight cycles.

The AD affects an estimated 3,716 engines installed on airplanes of U.S. registry. The cost of compliance is estimated to be $170 per engine for two hours labor at $85 per hour. If repairs are required, the cost is estimated to be $8,500 per engine for parts and labor.

(Image from file)

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC