Urgent CASA AD: Eurocopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 22, 2006

Urgent CASA AD: Eurocopter

Applicability: Eurocopter AS 365 N2 and N3 model helicopters.

Requirement:

1. Carry out a check for end play in the tail rotor hub (TRH) control plate in accordance with paragraph 2.B of Eurocopter Alert Service Bulletin (ASB) 05.00.52 or later DGAC approved revisions. If there is no end play in the TRH control plate no further action is required at this time.

2. If there is end play in the TRH control plate, remove and replace the pitch control rod bearing in accordance with paragraph 2.B.2 of Eurocopter ASB 05.00.52 or later DGAC approved revisions.

Note: EASA Emergency AD 2006-0051-E refers.

Compliance:

1. Within 50 flying hours after the effective date of this AD, thereafter at intervals not to exceed 110 flying hours.
2. Before further flight following the check carried out in Requirement 1 of this AD. This Airworthiness Directive becomes effective on 27 February 2006.

Background: This AD is in response to an event where tail rotor pitch control loss occurred during the landing phase of the helicopter. Failure of the pitch control rod bearing can lead to loss of control of the tail rotor and subsequent loss of control of the helicopter.

FMI: www.casa.gov.au

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC