GAO Reports The Cost Of The Lockheed Martin F-35 Program Has Gone Down | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Apr 04, 2014

GAO Reports The Cost Of The Lockheed Martin F-35 Program Has Gone Down

Airplane Manufacturer Gets A Pat On The Back For $11.5 Billion Cost Reduction ... And A Kick In The Behind For Slow Deliveries

Called the most expensive conventional weapon program history, the Lockheed Martin F-35 program has managed to reduce its costs by $11.5 billion, according to the Government Accountability Office’s definitive annual Assessment of Selected Weapons Report. Lockheed Martin got a pat on the back for cost reductions, but the GAO is not happy with delivery delays.

Here’s what the GAO had to say, “The contractor uses statistical process controls as one means to assess critical manufacturing processes. Twenty five percent of those processes are currently judged capable of consistently producing quality parts at the best practice standards. Production efforts have improved as the production line continues to show efficiencies and quality metrics show positive trends.” This was the “pat on the back” part of the report.

On the other hand, you know you’re in trouble when the word, “however,” shows up in a report. The report continues, “However, in 2013, problems with engine hoses, engine turbines, and specialty metals halted production deliveries for three months. In 2013, 35 planes were delivered to the government—eight less than originally planned. Aircraft deliveries were postponed for one month while the runway at the final assembly facility was resurfaced.”

It looks like Lockheed Martin has gotten out of the $1,000 toilet seat and $800 wrench business. Now they just need to learn how to read a calendar.

(USAF Image)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC