NASA'S Space Shuttle Discovery Rolls Off Launch Pad Tuesday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Dec 21, 2010

NASA'S Space Shuttle Discovery Rolls Off Launch Pad Tuesday

Launch Not Scheduled Until February 3rd

ANN Update 12.21.2010 0935 EST: Teams at NASA's Kennedy Space Center in Florida now are targeting space shuttle Discovery's roll from Launch Pad 39A back to the Vehicle Assembly Building for Tuesday night (Dec. 21), with first motion off the pad at 2200 EST.

Technicians are working to resolve an issue with the leveling system on the crawler-transporter. They believe a faulty transducer is the problem, and it can be changed out to support rollback, which the move is called, Tuesday night.

Original Story: Space shuttle Discovery is scheduled to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida for additional work related to its final scheduled mission. The first motion of the shuttle is targeted for 0030 EST on Tuesday, Dec. 21.

In the VAB, technicians will scan below the foam insulation surrounding the intertank section of Discovery's external tank to look for any issues, such as cracks. They also will reapply foam after removing 89 sensors from the tank's aluminum skin following an instrumented tanking test on Dec. 17.

The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out during the test. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5.

Discovery's next launch attempt is no earlier than 0137 on Feb. 3.

The fully assembled space shuttle, consisting of orbiter Discovery, the external fuel tank and twin solid rocket boosters, is mounted on a mobile launcher platform and will be returned to the VAB atop a crawler transporter. The crawler will travel slower than 1 mph during the 3.4-mile journey, which is expected to take about six hours.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC