Layoffs Reported At Falcon's Little Rock Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 07, 2009

Layoffs Reported At Falcon's Little Rock Facility

Industry Continues To Feel Repercussions Of Economy, Political Muck-Raking

Dassault Falcon announced today the layoff 111 workers from the Little Rock Completion Center. Another 42 workers have taken advantage of an “early out” program bringing the Center’s total workforce to 2100 employees, about the same as it was in early 2008.

“Each and every person affected by this layoff has been a valued member of our team and helped to contribute to our growth and success,” said John Rosanvallon, President and CEO of Dassault Falcon. “While we recognize the unfortunate impact this decision has on our employees and their families, we must face the reality of today’s market conditions and the significant challenges they pose to our industry.”

Dassault Falcon in Little Rock is the site of two strategic Falcon operations: the main Completion Center for all Falcon jets worldwide, and the company-owned Service Center, which is dedicated solely to Falcon customers. Current production model Falcons are manufactured in France, then flown in "green" condition to the Completion Center where optional avionics and custom interiors are installed, and exteriors are painted.

Expansion plans previously made for Little Rock may be in danger, for both Completions and Service Center areas. Construction plans 'set to continue into 2009,' were to expand Dassault Falcon - Little Rock to occupy nearly 827,000 total sq. ft.

FMI: www.falconjets.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC