AD: Rolls-Royce plc Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Dec 13, 2017

AD: Rolls-Royce plc Turbofan Engines

AD NUMBER: 2017-24-08

PRODUCT: All Rolls-Royce plc (RR) RB211-535E4-37, RB211-535E4-B-37, and RB211-535E4-C-37 turbofan engines with certain low-pressure (LP) fuel filter-to-high-pressure (HP) fuel pump tube assemblies, or HP fuel pump-to-fuel flow governor (FFG) or FFG-to-HP pump inlet overspill return tube assemblies and flanged adaptor, installed.

ACTION: Final Rule.

SUMMARY: The FAA is superseding airworthiness directive (AD) 2014-24-08 for the engines listed above.

AD 2014-24-08 required replacing certain LP fuel filter-to-HP fuel pump tube assemblies.

This AD retains the requirement in AD 2014-24-08 to remove the LP fuel filter-to-HP fuel pump tube, adds new compliance thresholds, and requires installation of new HP fuel pump-to-FFG and FFG-to-HP pump inlet overspill return tube assemblies and flanged adaptor.

This AD was prompted by fuel leaks that have occurred at the flanged joints of the HP fuel pump-to-FFG tube assembly and FFG-to-HP pump inlet overspill return tube assembly.

COST: The FAA estimates that this AD affects 100 engines installed on airplanes of U.S. registry. The cost of compliance is estimated to be $18,522.50 per aircraft for parts and labor.

DATES: This AD is effective January 16, 2018.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC