GE Honda Reports Completion Of First HF120 Engine Run Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 20, 2009

GE Honda Reports Completion Of First HF120 Engine Run Test

HF120 Rated At 2,095 Pounds Of Thrust

The first GE Honda HF120 engine has successfully started its initial test run at GE Aviation’s altitude test chamber in Evendale, Ohio, launching the test phase of the program.

“This is a significant milestone and represents the transition from the design-definition phase to the test and certification phase of the HF120,” said Bill Dwyer, president of GE Honda Aero Engines. “Over the next several weeks, we will be mapping the engine performance and operability around the flight envelope while utilizing the full capability of the altitude test chamber.”

“The joint GE and Honda teams in Tokyo, Lynn, Mass. and Evendale, Ohio have worked for more than two years toward this milestone and deserve kudos for their extensive collaboration,” said Masahiko Izumi, executive vice president of GE Honda Aero Engines.

The HF120 engine has experienced one of the most extensive engine test programs prior to the official start of FAA certification testing. To date, GE Honda Aero Engines has built and tested eight HF120 engine cores and 11 full engine demonstrators. During testing, the engine exceeded its design goal of 2095 lbs of thrust.

Thirteen HF120 development engines and two core builds will take part in the certification testing at six locations in the U.S. and Japan. Tests will include fan blade out, crosswind, stress and endurance testing. GE Honda also plans to test the engine on a flying testbed before flying on the customer certification aircraft. By entry into service, the HF120 will have accumulated more than 15,000 cycles of ground and flight testing.

HF120 engine production will initially begin at GE’s site in Lynn, Mass. and will later transition to Honda Aero Inc.’s recently completed engine production and overhaul facility in Burlington, N.C.

Rated at 2,095 pounds of thrust, the HF120 engine succeeds Honda’s original HF118 prototype engine, which has accumulated more than 4,000 hours of testing on the ground and in-flight. GE and Honda redesigned the engine for higher thrust and new standards of performance in fuel efficiency, durability, and low noise and emissions.

FMI: www.gehonda.com, www.geaviation.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC