Rockwell Collins Completes ADS-B Out Milestone On Three NAVAIR Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Nov 10, 2017

Rockwell Collins Completes ADS-B Out Milestone On Three NAVAIR Aircraft

First Time ADS-B Out Software Integrated With Flight Management Systems On C-2A, E2-C And P-3C Aircraft

Rockwell Collins recently completed the implementation of ADS-B Out software on C-2A, E2-C and P-3C aircraft for the Naval Air Systems Command (NAVAIR). The certified software brings these aircraft into compliance with the upcoming ADS-B Out mandates required by the end of 2019.

“The mandates are quickly approaching and we’re enabling the P-3 community to achieve compliance,” said Dave Schreck, vice president and general manager of Airborne Solutions for Rockwell Collins. “We have a long history of success with each of these platforms, lowering the risk associated with this type of upgrade.”

The initial software underwent flight testing and was confirmed production-ready without any adjustments required. This marks an industry first for the implementation of ADS-B Out software on three different platforms within NAVAIR. This will also pave the way for other platform certifications with similar transponder types such as the C-130 and C-5.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC