Hudson River Mid-Air Public Docket To Be Opened By NTSB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 28, 2010

Hudson River Mid-Air Public Docket To Be Opened By NTSB

Factual Information Release Provides No Analysis Of The Incident

In its continuing investigation of the midair collision of an air tour helicopter and a small plane over the Hudson River, the NTSB will open the public docket on Wednesday, April 28, 2010 at 1000. 

On August 8, 2009, at 1153 EDT, a Eurocopter AS 350 BA (N401LH) operated by Liberty Helicopters and a Piper PA-32R-300 (N71MC) operated by a private pilot, collided in midair over the Hudson River near Hoboken, New Jersey. The certificated commercial pilot and five passengers onboard the helicopter were killed. The certificated private pilot and two passengers onboard the airplane were also killed.

Visual meteorological conditions prevailed and no flight plans were filed for either flight. The local sightseeing helicopter flight was conducted under the provisions of 14 Code of Federal Regulations Part 136. The personal airplane flight was conducted under the provisions of 14 Code of
Federal Regulations Part 91. 
 
The information being released is factual in nature and does not provide any analysis. The docket includes: investigative group factual reports, interview summaries, crew statements, air traffic control transcripts, controller statements, the meteorology report, and other documents.
   
Additional material will continue to be added to the docket as it becomes available. Analysis of the accident, along with conclusions and a determination of probable cause, will come at a later date when the final report on the investigation is completed. 

FMI: www.ntsb.gov/Info/foia_fri.htm

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC