SPEEA: 737 MAX Decision Months In The Making | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Dec 02, 2011

SPEEA: 737 MAX Decision Months In The Making

Labor Organizations Made A Strong Case For Assembly In Renton

Boeing’s announcement to build the 737 Max at the Renton plant culminates months of work by labor, government and business to ensure the next generation aircraft will be built by the most experienced workforce in the world at building single aisle commercial aircraft, according to leaders of the Society of Professional Engineering Employees in Aerospace (SPEEA), IFPTE Local 2001.

“This is really good news for employees, our communities and Boeing,” said SPEEA President Tom McCarty. “It means secure jobs continuing far into the future.”

SPEEA, along with the IAM and others, co-sponsored an independent study of possible locations for the 737 MAX. Released earlier this month, the study showed building the new aircraft in Renton, where the existing 737 is built, is the best option with the lowest risk. Government and businesses also helped fund the study and campaign, called Project Pegasus.

“This was a very proactive effort to make sure these planes are designed and built by the most experienced and productive workforce in the world,” McCarty said. “That workforce includes the employees represented by SPEEA and the IAM in Washington, Oregon and Kansas.”

FMI: www.speea.org

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC