Nextant Aerospace 400NEXT Phase 1 Completes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 12, 2010

Nextant Aerospace 400NEXT Phase 1 Completes First Flight

Flight Marks Transition To Production Aircraft

Nextant Aerospace today announced the first flight of a fully equipped Phase 1 400NEXT aircraft. The flight took place Thursday February 25th and completed the transition from experimental to production aircraft.

“With the completion of the STC for the Rockwell Collins Pro Line 21 Flight Deck Upgrade in October, Nextant is now offering the 400NEXT aircraft in a two phase program. The Phase 1 aircraft is being built according to the 400NEXT configuration including the Pro Line 21 cockpit, but retains the Pratt & Whitney JT15D-5 engines. Phase 2 will be the installation of the Williams FJ44-3AP engines once that certification is complete. We were extremely happy with the outcome of the Phase 1 first flight. This flight also highlighted the capabilities of the Rockwell Collins Venue™ cabin management system, the Aircell Axxess system, and the ATG 4000 High Speed Internet,” said James Miller, President of Nextant Aerospace.

The Phase 1 400NEXT aircraft, N401NX, was outfitted with the following equipment which will be optional items on the complete 400NEXT aircraft:

  • Aircell Axxess cabin communications system and ATG 4000 High Speed Internet.
  • iShades - solid state window shades allowing passengers to electronically adjust the amount of natural light coming into the cabin.
  • Rockwell Collins Venue cabin management system.
  • High definition (HD) audio/video system.
  • Media Center with Blu-ray Disc player and HD Airshow Map.
  • Dual iPod docks.
  • Dual 10.6” HD displays pluggable at any seat.

"Being able to offer such a high tech cabin is something we are extremely excited about. In the past internet access in light jets was unheard of; typically a jet owner would have to own a large cabin aircraft to be offered that amenity. During the installation and testing of the High Speed Internet System, we found the speed of the connection to be faster in the air than on the ground,” said Miller.

The Nextant 400NEXT is designed to overcome limitations to the popular Hawker Beechcraft 400XP/400A, by replacing the existing Pratt & Whitney JT15D engines with the new modern Williams International FJ44-3AP computer controlled engines along with the new Rockwell Collins Pro Line 21 avionics. The range of the 400NEXT will be increased from 1333 nautical miles to over 2000 (4 passenger, NBAA IFR range) with a 30% reduction in operating costs based on fuel savings alone.

FMI: www.nextantaerospace.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC