Navy Ups Production Of P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Nov 11, 2011

Navy Ups Production Of P-8A Poseidon Aircraft

2nd Phase Of Low-Rate Initial Production Also Includes Spares, Logistics And Training

The U.S. Navy has awarded Boeing a $1.7 billion low-rate initial production (LRIP) for seven additional P-8A Poseidon maritime surveillance aircraft. LRIP-II is the follow-on to an initial LRIP-I contract awarded in January to provide six Poseidon aircraft. Overall, the Navy plans to purchase 117 Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.

As part of the contract, Boeing will provide aircrew and maintenance training for the Navy beginning in 2012, in addition to logistics support, spares, support equipment and tools. The training system will include a full-motion, full-visual Operational Flight Trainer that simulates the flight crew stations, and a Weapons Tactics Trainer for the mission crew stations.

"This contract is the result of the Boeing and Navy team's hard work and commitment, and moves us a step closer to P-8A full-rate production," said Chuck Dabundo, Boeing vice president and P-8 program manager. "We've assembled and flown the first LRIP plane and continue to focus on building P-8A aircraft on cost and on schedule."

"LRIP-II brings the P-8A program one step closer to delivering the Poseidon to the fleet," said Capt. Scott Dillon, P-8A deputy program manager for the Navy.

Boeing completed assembly of the first LRIP-I aircraft at its Renton, Wash., facility this summer. The aircraft subsequently completed a successful first flight July 7, 2011, from Renton Field to Boeing Field, which marked its transition from fabrication and assembly to mission system installation and checkout in Seattle.

The Poseidon team is using a first-in-industry in-line production process that draws on Boeing's Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly.

The team has built and is testing six flight-test and two ground-test aircraft under the U.S. Navy System Development and Demonstration contract awarded to Boeing in 2004. Four flight-test aircraft -- T1, T2, T3 and T5 -- are conducting testing at Naval Air Station Patuxent River, Md. The program's static test plane, S1, completed its test program in January. S2, the fatigue test plane, will begin testing next year. Initial operational capability is planned for 2013.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC