FAA Taps ITT, GE’s Naverus To Develop NextGen Procedures | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 11, 2012

FAA Taps ITT, GE’s Naverus To Develop NextGen Procedures

Companies Will Put Together RNP Approaches For Five U.S. Airports

The FAA is awarding a contract to ITT Corp. and GE’s Naverus to help accelerate the development of satellite-based procedures that will allow aircraft to fly more directly to their destinations. “NextGen will help deliver an environmentally friendly, more efficient traveling experience for the flying public,” said U.S. Transportation Secretary Ray LaHood.

Under the $2.77 million contract, ITT Corp., the prime contractor, and GE’s Naverus, the sub-contractor, will develop Required Navigation Performance (RNP) approach procedures into five airports: Ted Stevens Anchorage International, James M. Cox Dayton International, Kansas City International, General Mitchell International (Milwaukee) and Syracuse Hancock International. ITT Corp. and GE’s Naverus will be responsible for designing, implementing and maintaining a total of 10 procedures – two for each airport. The FAA will closely monitor the work to make sure all safety and environmental steps are conducted properly. This effort will supplement the FAA’s work to develop RNP procedures for airports across the country. The FAA has developed 305 RNP procedures.
 
“If you imagine highways in the sky, then these are high-speed off ramps,” said Acting FAA Administrator Michael Huerta. “Aircraft using RNP approaches make a more direct and efficient approach into the airport, also decreasing fuel burn.”
 
The FAA awarded the contract to ITT Corp. and GE’s Naverus through a competitive process under the System Engineering 2020 contract, a portfolio of work designed to help the agency roll out NextGen. Fiscal year 2012 appropriations included funding for a contractor to develop and deliver NextGen procedures, and the FAA reauthorization bill called for the agency to demonstrate the ability of a contractor to design, implement and maintain these procedures.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC