Eurofighter Typhoon Logs 10,000 Flight Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Aug 09, 2006

Eurofighter Typhoon Logs 10,000 Flight Hours

Time flies -- and so does the Eurofighter Typhoon... The Eurofighter Typhoon fleet in the four partner air forces of Germany, Italy, Spain and the United Kingdom has surpassed the 10,000 flying hours in July 2006. Together with 4.550 flying hours of the test aircraft, the Eurofighter Typhoon fleet is approaching the 15,000 flying hours mark rapidly.

Aloysius Rauen, CEO Eurofighter GmbH notes that, “The four national Eurofighter consortium has delivered over 90 aircraft to date. Seven units are flying the aircraft and Eurofighter Typhoon is set to take on more operational tasks in the near future. Italy protects its air space with armed Eurofighters since end 2005. Only recently the German Air Force started operations with their second Eurofighter wing, the Royal Air Force operates Eurofighter Typhoon in major aerial exercises and the Spanish Air Force is set to inaugurate their first operational Eurofighter Typhoon unit soon.

In the meantime discussions with our customer on further enhancing the multi-role capabilities of Eurofighter Typhoon – as originally planned with the Tranche 2 contract by introducing new air-to-air and stand-off weapons – are progressing. This enhancement is urgently required by all partner air forces. The recent contract signature for the integration of a Laser Designator Pod to the Royal Air Force’s Tranche 1 aircraft is a significant step on this route.”

Throughout this summer the flight test programme focuses on finalisation of the main development work for initial air-to-ground tasks including further tests with Laser Guided Bombs (Paveway II, GBU-10, GBU-16).

FMI: www.eurofighter.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC