SportPlane Construction Techniques Intrigue Cessna | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 07, 2006

SportPlane Construction Techniques Intrigue Cessna

Cessna Has Been Watching The SportPlane Movement Carefully... Guess Why?

You can't say you didn't see this one coming... As Cessnas executives think about whether they'll build a light sport aircraft, they're faced with the rather daunting task of trying to do so at light sport prices.

CEO Jack Pelton says that it wouldn't make sense to build such an aircraft if Cessna can't sell it for less than $100-thousand. That's between half and a quarter of the cost of buying a single-engine aircraft fresh off the assembly line these days. So how do you cut costs to make that possible? The Wichita Eagle's aviation reporter, Molly McMillin, tells us Cessnas is now looking at the same sorts of technologies and methods used by the homebuilt industry. Matched-hole drilling is one way Pelton figures he can bring the cost way down.

Now... you home builders can call us out on this if you want, but my understanding of matched-point drilling is -- you pre-drill holes in the aluminum skin of the aircraft, using computers to line up the drill-points on parts that could very well be made in different places. That way, when you get ready to assemble the aircraft, the holes line up and -- voila! -- you simply insert the bolts or rivets to tie the parts together. Cessna engineers tell the Eagle this is a very accurate way to build aircraft. Pre-drilling allows for time and cost savings during final assembly... they say. And it seems to have worked pretty well with the light sport concept plane shown at Oshkosh last month.

How did Cessna engineers come up with the idea of matched-point drilling?

You're gonna LOVE this... as it seems that one of them has been putting together a SportPlane kit in his garage, and... well, you can figure out the rest. You CAN teach an old dog some new tricks.

FMI: www.cessna.textron.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC