AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 16, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-03

PRODUCT: Certain Airbus Model A310-203, -204, -221, -222, -304, -322, -324, and -325 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2009-18-16, which applied to the aircraft listed above. AD 2009-18-16 required an inspection for cracking of certain fastener holes on certain frames, and related investigative and corrective actions if necessary; and modification of certain fastener holes.

This new AD reduces the compliance times. This AD was prompted by the identification of a structural modification that falls within the scope of the work related to the extension of the service life of the affected airplanes and widespread fatigue damage evaluations.

DATES: This AD is effective April 19, 2018.

COST: The FAA estimates that this AD affects 8 airplanes of U.S. registry. It will take about 41 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $20,180 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be $189,320, or $23,665 per product.

Although no definitive data has been received that will enable the FAA to provide cost estimates for the on-condition actions (i.e., additional inspection and modification for certain airplanes) specified in this AD, it has been determined that the total repair costs could be up to $10,000 per product. The FAA has no way of determining the number of aircraft that might need these repairs.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC