Bell Helicopter Confirms Delay In Relentless Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 01, 2017

Bell Helicopter Confirms Delay In Relentless Certification

Aircraft Have Been Grounded Since July 2016 Accident

Bell Helicopter has confirmed that there will be a delay in the certification of its 525 Relentless helicopter due to a fatal accident involving one of its test aircraft last July.

The company says that the two remaining flight test aircraft have been grounded since the accident pending the release of the NTSB's probable cause report. Two test pilots were fatally injured when the test aircraft went down on July 6, 2016. Bell has not even performed ground runs of the aircraft since the accident.

Larry Thimmesch, vice-president of 525 sales and business development said that the five-year certification window with the FAA expired late last year. That has been extended for two years, taking the program to the end of 2018.

Thimmesch said that Bell has made modifications to its two remaining flight test aircraft to facilitate the quick resumption of the flight test program once the NTSB has released its findings. He also said that Bell remains "very committed" to the Relentless program.

Another two aircraft are in final assembly, Thimmesch said, while the two existing aircraft are being upgraded to bring them to production-standard configuration.

(Image from file)

FMI: www.bellhelicopter.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC