Cassini Probe Successfully Swaps Thrusters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Mar 13, 2009

Cassini Probe Successfully Swaps Thrusters

Now Running On Backup System

Early Thursday morning, the Cassini spacecraft relayed information that it had successfully swapped to a backup set of propulsion thrusters late Wednesday.

The swap was performed because of degradation in the performance of the primary thrusters, which had been in use since Cassini's launch in 1997. This is only the second time in Cassini's 11 years of flight the engineering teams have gone to a backup system.

The thrusters are used for making small corrections to the spacecraft's course, for some attitude control functions, and for making angular momentum adjustments in the reaction wheels, which also are used for attitude control. The redundant set is an identical set of eight thrusters. Almost all Cassini engineering subsystems have redundant backup capability.

Cassini has successfully completed its original four-year planned tour of Saturn, and is now in extended mission operations. The Cassini-Huygens mission is a cooperative project of NASA, the European Space Agency and the Italian Space Agency.

JPL, a division of the California Institute of Technology in Pasadena, manages the Cassini mission for NASA's Science Mission Directorate, Washington, DC. The Cassini orbiter was designed, developed and assembled at JPL.

FMI: http://saturn.jpl.nasa.gov, www.nasa.gov/cassini

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC